top_info.gif (16KB)Hi Tech logo
.Building PartnershipsOnline Home ShowsBuild Your Own ProjectTour the FactoryInvestment CentreRequest More Information.
o
 
NEW Optima Advertisements

Click on Thumbnail for Full Size

IHI R&D AND MANUFACTURING FACILITY - RECENT ACTIVITY
June 26, 2009

IHI R&D AND MANUFACTURING FACILITY - RECENT ACTIVITY
February 3, 2009

IHI R&D AND MANUFACTURING FACILITY - RECENT ACTIVITY
February 19, 2009

IHI R&D AND MANUFACTURING FACILITY - RECENT ACTIVITY
March 5, 2009

IHI R&D AND MANUFACTURING FACILITY - RECENT ACTIVITY
April 2, 2009

Surrey / North Delta Leader
July 15, 2005

Tri-City News
July 16, 2005

Home Buyer's Guide
July 22, 2005

Surrey / North Delta Leader
July 22, 2005

Burnaby / New Westminster
News Leader
July 22, 2005
 
o
 A STATE-OF-THE-ART RESIDENTIAL HIGH-RISE COMPLEX IN THE NEW SURREY CITY CENTER

The OPTIMA Residential Complex project will be situated in the New Central Area of the City of Surrey, B.C. The Architectural Design passed the third reading (public hearing) on July 21, 2005. The Servicing Agreement was approved in 2006. The Development Permit is still pending the automatic 4th reading approval after paying and posting the necessary financing requirements induced by The City of Surrey to cover the costs associated with the off-site works. The Developer IHI DEVELOPMENT II retained a group of local Professional firms for the Structural, Engineering, Landscape Architecture, Interior Design, Electrical Engineering, Mechanical Engineering, Off-Street Civil Engineering, Street Lighting, Site Surveying. IHI will prepare in due time the manufacturing shop drawings for the Hi-Tech Panels to be used in the Construction of the Buildings. A new Architectural firm will replace the firm of Mr. Raymond Ching that due to health reasons had to resign from the project.

The project consists in the realization of three residential high-rise buildings; one 21 stories high and two 18 stories high; each of the towers has indoor and outdoor amenities in addition to a Child Care Center as well as two basements for under-ground parking and off-street visitor parking. The site is bisected by the Skytrain with stations within 2 blocks. The total gross area of the project amounts to 23,836 m² and the area of the site 8,110 m².

IHI DEVELOPMENT II was very fortunate to receive an invaluable guidance and support from all members of the Planning Department of the City of Surrey that contributed to the unanimous approval of the design of the complex by the Honorable Mayor of Surrey and his distinguished Councilors.

Surrey, the "City of Parks", is the second largest City in the province of British Columbia. It continues to evolve at an incredible pace achieving business and recreational successes. Every month the City welcomes 900 new residents. With over 16,000 businesses, Surrey offers a diversified industrial manufacturing and service base in addition to a wide range of business opportunities.

Surrey has more than 40 shopping centers encompassing over 520,000 square meters. The Surrey Place Shopping Center and Gateway (a $725 million commercial/residential development) is within walking distance from our site.

We are proud to post in our website our "unique articulated design to be built with state-of-the art building technology" as described by the City Planners.

IHI is completing the manufacturing of the IHI Panels for the Offices and a typical 2 bedroom corner suite that will be displayed on site as a Presentation Center. The typical corner unit will later be dismantled and used as part of Tower 1 once the developer secures the financing for the Project and starts developing the project. Please see the new presentation posted on the home page of our website illustrating the manufacturing progress of the Optima Presentation Center.

Further news releases will be issued to invite the International Architects, Developers and Contractors that expressed high interest in witnessing the construction of the first tower. IHI is counting on the above development to attract future strategic partners.

A further news release will be also issues to invite the public to visit IHI Presentation Center to be established on site in the very near future.

IMPORTANT DISCLAIMER: The optima project was never built and contrary to the false claims of Fanuc/GE that were successfully advanced unfortunately in Court, that IHI built the Optima Project in 2005 -- 2006 USING Fanuc/ GE Defaulted System that they installed at IHI's R&D Manufacturing Facility in 2000 -- 2001. Again, currently the site is still empty.

This document can't be construed by any means as any type of offering, and strictly a technical case study in a very new and vibrant downtown.

The Development Company of the Optima Towers owned/controlled by the President's Mother, has entered into an agreement with IHI to build the Center and feature some of the advanced details for the Optima high-rises to allow International first class advanced equipment suppliers to bid for the solution to automate the cutting and welding process at the IHI R&D and Manufacturing Facility in Delta, BC., after the above mentioned Fanuc/GE default.



View the Optima High Rise Presentation. (DWF, 5.5 Mb)

Get your free copy of Autodesk DWF Viewer now! Autodesk DWF Viewer is required to view DWF images.
You may download the free dwf viewer from Autodesk's web site.
 
oIHI Corporate Presentation Video
 
High Quality version (32 MB) Low Quality version (2.3 MB)
Windows Media Player required
 
 

Legal Disclaimer | Home

General Info
News Releases
Current Stock Info
Past Financials
Request More Information
Outside Links
Investor Fact Sheet
Presentation
Home
.